Slab preparation is critical for glue down and includes sanding scraping leveling and filling low spots because the slab must be flat so the planks can fit correctly.
Glue down hardwood floor installation.
The feel and sound of glued down flooring is reminiscent of the traditional hardwood floors of generations past.
How to install glue down engineered wood flooring on concrete slab preparation.
The floor will be glued directly to the sub flooring using a hardwood flooring adhesive.
The installation of hardwood floors by the glue down method is used predominately on concrete slabs.
Glued down flooring sounds more solid and is less forgiving as you walk.
All wet work such as concrete masonry framing members drywall paint etc should be thoroughly dry.
If installing glue down hardwood flooring in a new house completely close the building in with all outside doors and windows in place.
Glue down hardwood floors on concrete.
With that said one of the most important factors while dealing with glue down installation is going to be your subfloor.
Glue down hardwood floors are amongst the first of their kind but that doesn t mean that they went obsolete with the passing of time.
Because of the way it is installed there isn t a hollow sound when walking across the floor or a spongy feel this is something that can be an issue with floating floors if they aren t installed perfectly and with optimal conditions.
As mentioned previously glued down floors are a bit of a more permanent option.
Subfloor preparation is critical on all job sites but especially for glue down.